Project Overview

Refurbishment of commercial plantroom serving a hospital, the hospital remained operational for the duration of the works by utilising a temporary boiler plant sited outside the plant room, the existing boiler and pumps were stripped out and replaced with a modular boiler system comprising of 8 boilers in a back to back configuration with a total heat output of 920kW. Upon completion of the installation the new boilers were fully commissioned before changeover from the temporary plant onto the new installation

 